ITEM 9 OF 9

5 Bridges Equipment

This entry is different to the other eight. Items 1–8 are site assessments of existing skateparks in Gateshead. This is a short note on the obstacles from the original 5 Bridges Plaza, which are held in council storage following the 2025 closure and remain available for relocation to the chosen replacement site.

Condition: confirmed good. The equipment is in serviceable condition and suitable for direct reuse at the chosen replacement site — clean, repaint, install. No per-item condition assessment is needed; relocation cost is the equipment-relocation line in § F Finance.

Context

Original location5 Bridges Plaza (NE8 4AU) — closed 2025
Current locationCouncil storage
ConditionGood — direct reuse

Inventory (typical 5 Bridges features)

The original park carried a plaza/street feature set: ledges, manual pads, flatbars, rails, hubbas, banks, and small transition elements. Specific item counts and dimensions inform the Phase 1 equipment layout once a site is selected; for the purposes of this study the relevant fact is that the feature set is intact and reusable.

Site Fit

Site Footprint fit Terrain fit
Askew Road (842 m²) Tight — forces careful curation of which items reused Good — dense plaza layout matches original 5 Bridges feel
Gateshead Stadium (4,883 m²) Generous — relocated equipment likely sparse across site Good — open area suits plaza/street layout
Car park conversion (TBC) Dependent on chosen building Good for plaza/street items; bowl/tall transition not viable on enclosed levels

Reuse approach is set out per-site in § 6 Site Proposals; the relocation cost line (working estimate £30–50k across all three approaches) is in § F.2 Finance.